Eurovaistinė logistics centre
The 11.8 thousand sq. m A++ energy efficiency class building is probably the most modern pharmaceutical logistics centre in the Baltic states

Conres
Client
EVDS UAB
Country
Lithuania
Architect / Designer
G. Stogis / 2L Architects UAB
01
Project area:
11,800 sq.m
02
Construction period:
The 2nd quarter of 2024 to the 2nd quarter of 2025
Most of the area is intended for storage facilities and includes innovative solutions for the reception, storage, automated collection, distribution and dispensing of medicinal products, food supplements, cosmetics and other similar categories of products.
The Eurovaistinė logistics centre will be built on a 4.6 ha plot. The building is being built to achieve a BREEAM ‘in-use excellent’ rating.
03
Energy efficiency class:
A++
Business centre on Konstitucijos avenue 14A
Refinis factory
Construction of the Memelio Miestas
Omniva parcel sorting terminal
Construction of the KG Constructions Group factory and office building
Finished
“Litgrid” system control and data center
Finished
“FREEDOM 36” bussines center
Finished
“UNIQ” green business center evaluated with LEED platinum standard
Finished
“CUBE” A class business center
Finished
“Creolink” Warehouse With Administrative Premises
Finished
“Continental Automotive” administrative building
Finished
„Jonava 30“ business center
Finished