Refinis factory

Conres is carrying out the construction of the production and industrial building

Conres

Client

Refinis UAB

Country

Lithuania

Architect / Designer

Laura Bagdžienė / Bendrieji Statybų Projektai UAB

01

Project area:

8,400 m²

02

Construction period:

The 2nd quarter of 2023 to the 2nd quarter of 2024

03

Energy efficiency class:

A++

The most advanced technologies are planned to be used in the Refinis factory. The main device, the smelting furnace, will be powered by electricity to avoid burning fossil fuels and to minimise the emission of greenhouse gases.

The technological process of production will consist of three stages: the smelting of crushed car catalysts in a plasma furnace, the concentration of the extracted alloy and chemical purification of precious metals and the extraction of platinum, palladium and rhodium. Processing up to 5,580 t of crushed car catalysts and the extraction of up to 17.5 t of precious metals per year is planned.

Project

Materials:

  • Pole foundations
  • Reinforced concrete columns and reinforced concrete overlay
  • Roof metal structures
  • Sandwich panels
  • Flat roof with TPO coating

Features:

  • Highly corrosive environment inside the building
  • Very high temperatures inside due to technological processes