Refinis factory
Conres is carrying out the construction of the production and industrial building
Conres
Client
Refinis UAB
Country
Lithuania
Architect / Designer
Laura Bagdžienė / Bendrieji Statybų Projektai UAB
01
Project area:
8,400 m²
02
Construction period:
The 2nd quarter of 2023 to the 2nd quarter of 2024
03
Energy efficiency class:
A++
The most advanced technologies are planned to be used in the Refinis factory. The main device, the smelting furnace, will be powered by electricity to avoid burning fossil fuels and to minimise the emission of greenhouse gases.
The technological process of production will consist of three stages: the smelting of crushed car catalysts in a plasma furnace, the concentration of the extracted alloy and chemical purification of precious metals and the extraction of platinum, palladium and rhodium. Processing up to 5,580 t of crushed car catalysts and the extraction of up to 17.5 t of precious metals per year is planned.
Materials:
- Pole foundations
- Reinforced concrete columns and reinforced concrete overlay
- Roof metal structures
- Sandwich panels
- Flat roof with TPO coating
Features:
- Highly corrosive environment inside the building
- Very high temperatures inside due to technological processes
Eurovaistinė logistics centre
Business centre on Konstitucijos avenue 14A
Construction of the Memelio Miestas
Omniva parcel sorting terminal
Construction of the KG Constructions Group factory and office building
Finished
“Litgrid” system control and data center
Finished
“FREEDOM 36” bussines center
Finished
“UNIQ” green business center evaluated with LEED platinum standard
Finished
“CUBE” A class business center
Finished
“Creolink” Warehouse With Administrative Premises
Finished
“Continental Automotive” administrative building
Finished
„Jonava 30“ business center
Finished