Fire and Rescue Department

“Conresta” was entrusted with the construction work for the second building of the tender announced by the "Fire and Rescue Department" on Švitrigailos street in Vilnius.

Finished
General contractor

JSC "Conresta"

Client

Fire and Rescue Department

Country

Lithuania

Architect / Designer

JSC „Unitectus"

01

Construction start:

2014 02

02

Construction duration:

21 months

03

Project area:

2 072 m2

04

Stadium area:

12 809 m2

During the construction, major repairs were carried out and a special hiding place, necessary for the operation of the State Emergency Center, was installed. The aim of the project was to adapt all the basement premises to a hiding place where the State Emergency Center is located, to reinforce the building’s supporting structures and to restore the structures’ performance. The total area of the renovated building is 2072.26 sq. meters. The basement area is 310.56 sq. meters.