fr lt en

„Alviva“ Sewing Factory

At the beginning of 2017, a special-purpose sewing factory “Alviva” was built in Švenčionėliai district, with a total area of over 3,500 sq. meters. The project was implemented by “Conresta”, a general contracting and construction company.

Finished
General contractor

JSC "Conresta"

Client

JSC „Alviva“

Country

Lithuania

01

Construction start:

2016 05

02

Construction period:

7 months

03

Project area:

3500 m2

The three-story building can accommodate 120 employees at a time. The object is equipped with geothermal heating system and roof solar panels, which store energy for the illumination of the area at night. The value of the object under construction is more than 1 million euros. The building is designed using BIM 3D modeling.

Thank you for successfully realizing our goals by combining beauty with rationality, quality and modernity. Your hands have created a comfortable job environment and positive emotions.

Vaclav Aleksandrovich, CEO of “Alviva”

Other projects

Eurovaistinė logistics centre

Stage I of Ukmergė Industrial Park

Refinis factory

Omniva parcel sorting terminal

Lidl Lietuva (Lidl Lithuania) logistics centre

Finished

Modernisation of the Medininkai Border Crossing Point

The construction of Vilnius Combined Heat and Power Plant using municipal waste and biofuel

Construction of the KG Constructions Group factory and office building

Finished

“Vilniaus Baldai” Factory in Trakai District (Value – 50 Million Euros)

Finished

Automated Lithuanian Post Logistics Center

Finished

“Litgrid” system control and data center

Finished

Automated “Continental Automotive” factory in the FEZ of Kaunas

Finished

“Creolink” Warehouse With Administrative Premises

Finished

The Construction of 2 Modules of “Hegelmann Transporte” Logistics Complex

Finished

A Modern Food Production Manufactory of “Vilnius Poultry Farm” in Rudamina

Finished

“Ogisanda” Warehouse & Administration Building

Finished

“Ikarai” Liquid Fertilizer Plant, Kėdainiai FEZ

Finished

“Hansa Flex Hidraulika” Administrative, Industrial & Warehouse Building

Finished

Class A Logistics Center of „Liepkalnis Industrial Park”

Finished

“Kaišiadorys Poultry Farm” Bird Breeding Complex

Finished

Fire and Rescue Training Center

Finished

“Brenntag Lithuania” Warehouse & Administration Building

Finished

“ABB” High Voltage Switchgear in Alytus

Finished

„Entafarma“ Pharmaceutical Warehouse & Administration Building

Finished

“Grainmore” Automated Probiotic Processing Plant & Laboratory

Finished

The Reconstruction of Industrial Sewing Building “Lelija”

Finished

“Schmitz Cargobull Baltic” Production Building

Finished

Eišiškės Border Control Point

Finished

The Extension of “WOOD LINE” Warehouse

Finished

The Reconstruction of “Galinta & CO” Production Lines

Finished

Fire and Rescue Department

Finished

“Airo Catering Services Lietuva” Cooking Manufactory