fr lt en

The Extension of “WOOD LINE” Warehouse

“WOOD LINE” – a leader in the wholesale and retail of furniture and interior materials in the Baltics – has expanded its storage facilities. The project was entrusted to one of the largest construction companies in Lithuania “Conresta.”

Finished
General contractor

JSC "Conresta"

Client

JSC „AURA Realty“

Country

Lithuania

01

Project area:

7 000 m2

02

Building area:

13 000 m2

03

Owner:

UAB „WOOD LINE“

The 7000 sq. m. warehouse was added to the two existing buildings. The two-storey structure consists of prefabricated reinforced concrete and steel columns. Steel trusses were used to keep the roof insulated. The entire 13,000 sq. m. warehouse complex is characterized by extremely high energy efficiency: it is designed to operate in separate zones when needed. “Conresta” has carried out the project preparation, installation of concrete floors and installation of epoxy floor coverings.

The new facilities have brought all of the “WOOD LINE” units together in one place, increasing productivity, customer service, employee communication and logistics. Due to its strategically convenient location for developing excellent transport links with national and international motorways, “Berendsen PLC”, a European leader in textile, hygiene and safety solutions, is also located here.

04

Features:

High energy efficiency

Other projects

Eurovaistinė logistics centre

Stage I of Ukmergė Industrial Park

Refinis factory

Omniva parcel sorting terminal

Lidl Lietuva (Lidl Lithuania) logistics centre

Finished

Modernisation of the Medininkai Border Crossing Point

The construction of Vilnius Combined Heat and Power Plant using municipal waste and biofuel

Construction of the KG Constructions Group factory and office building

Finished

Automated Lithuanian Post Logistics Center

Finished

“Vilniaus Baldai” Factory in Trakai District (Value – 50 Million Euros)

Finished

“Litgrid” system control and data center

Finished

Automated “Continental Automotive” factory in the FEZ of Kaunas

Finished

“Creolink” Warehouse With Administrative Premises

Finished

The Construction of 2 Modules of “Hegelmann Transporte” Logistics Complex

Finished

A Modern Food Production Manufactory of “Vilnius Poultry Farm” in Rudamina

Finished

“Ogisanda” Warehouse & Administration Building

Finished

“Ikarai” Liquid Fertilizer Plant, Kėdainiai FEZ

Finished

“Hansa Flex Hidraulika” Administrative, Industrial & Warehouse Building

Finished

Class A Logistics Center of „Liepkalnis Industrial Park”

Finished

“Kaišiadorys Poultry Farm” Bird Breeding Complex

Finished

Fire and Rescue Training Center

Finished

“Brenntag Lithuania” Warehouse & Administration Building

Finished

“ABB” High Voltage Switchgear in Alytus

Finished

„Alviva“ Sewing Factory

Finished

„Entafarma“ Pharmaceutical Warehouse & Administration Building

Finished

“Grainmore” Automated Probiotic Processing Plant & Laboratory

Finished

The Reconstruction of Industrial Sewing Building “Lelija”

Finished

“Schmitz Cargobull Baltic” Production Building

Finished

Eišiškės Border Control Point

Finished

The Reconstruction of “Galinta & CO” Production Lines

Finished

Fire and Rescue Department

Finished

“Airo Catering Services Lietuva” Cooking Manufactory