fr lt en

Automated “Continental Automotive” factory in the FEZ of Kaunas

German automotive parts manufacturer “Continental Automotive” opened a factory in Kaunas FEZ, Lithuania. The investment amounts to 95 million euros, which is the largest greenfield investment in the manufacturing sector in Lithuania in the last two decades. General contracting and construction company “Conresta” was one of the two main contractors entrusted with the construction of the project.

Finished
Main contractor

JSC "Conresta"

Client

„Continental Automotive"

Country

Lithuania

Architect / Designer

JCS "Baltic Engineers"

01

Project area:

23 000 m2

02

Project value:

95 mln. Eur

03

Construction period:

2018 08 - 2019 10

A GIANT OBJECT BUILT IN 15 MONTHS

The construction of “Continental Automotive Lithuania” electronic components factory began in July 2018. The production, administration and warehousing facilities (23,000 sq. meters) were built in just 15 months. The company invested 95 million euros, which became significant for the development of the automotive industry not only in Kaunas, but in the whole country as well. It is planned to employ up to 1 thousand workers by 2021. The factory is set to receive the prestigious internationally recognized “LEED Gold” certification for its impressive construction process solutions. The “Continental” project was developed by “Baltic Engineers”. General contracting and construction company “Conresta” has become one of the two main contractors for the project. We were entrusted with the construction of the first and then the second phase of the project development.

The complex consists of two buildings. The main building covers an area of almost 20 thousand sq. meters and has 17-meter-high production and storage facilities. The front of the building has two floors administrative premises. There is a separate staff restaurant, common open-plan work areas, lounges, patios, a gym, and an outdoor basketball court. The complex also includes a separate technical building of more than 1 thousand sq. meters, as well as storage shelters and security posts.

“All of the special materials, the specific requirements and the adjustment work involved a number of risks. We had to work carefully, everything had to meet the highest requirements of terms and quality, thus we were always looking for the optimal solutions. There were daily meetings to discuss everything in detail, and the goals discussed had to be achieved the next day. All of our partners have made a great contribution in understanding the importance of this object,” says L. Laukaitis.

Project

Managed risks

  • High groundwater
  • Short terms

Materiality

  • Epoxy flooring
  • Special drop ceiling

Innovation

  • Roof - "Controlit" inspection system
  • Congeneration power plant

International standards

  • LEED PLATINUM
  • Industrie 4.0
  • FM Global
  • ASHRAE

Technology

  • BIM
  • DALUX
04

Jobs created:

1000

05

Energy efficiency class:

A+

06

International Standard:

LEED Gold

07

Innovative construction management:

BIM

“I am pleased to confirm that we are fully on track for this project and that Lithuania is meeting all of our expectations. We have been able to prepare the building for production in 15 months and at the same time have formed a strong team of almost 200 professionals. It’s truly impressive.”

Shayan Ali, the Managing Director of “Continental Automotive Lithuania.”

Other projects

Finished

Modernisation of the Medininkai Border Crossing Point

Finished

Automated Lithuanian Post Logistics Center

Finished

“Vilniaus Baldai” Factory in Trakai District (Value – 50 Million Euros)

Finished

“Litgrid” system control and data center

Finished

“Creolink” Warehouse With Administrative Premises

Finished

The Construction of 2 Modules of “Hegelmann Transporte” Logistics Complex

Finished

A Modern Food Production Manufactory of “Vilnius Poultry Farm” in Rudamina

Finished

“Ogisanda” Warehouse & Administration Building

Finished

“Ikarai” Liquid Fertilizer Plant, Kėdainiai FEZ

Finished

“Hansa Flex Hidraulika” Administrative, Industrial & Warehouse Building

Finished

Class A Logistics Center of „Liepkalnis Industrial Park”

Finished

“Kaišiadorys Poultry Farm” Bird Breeding Complex

Finished

Fire and Rescue Training Center

Finished

“Brenntag Lithuania” Warehouse & Administration Building

Finished

“ABB” High Voltage Switchgear in Alytus

Finished

„Alviva“ Sewing Factory

Finished

„Entafarma“ Pharmaceutical Warehouse & Administration Building

Finished

“Grainmore” Automated Probiotic Processing Plant & Laboratory

Finished

The Reconstruction of Industrial Sewing Building “Lelija”

Finished

“Schmitz Cargobull Baltic” Production Building

Finished

Eišiškės Border Control Point

Finished

The Extension of “WOOD LINE” Warehouse

Finished

The Reconstruction of “Galinta & CO” Production Lines

Finished

Fire and Rescue Department

Finished

“Airo Catering Services Lietuva” Cooking Manufactory