“Hansa Flex Hidraulika” Administrative, Industrial & Warehouse Building
On May 26, 2017, “Hansa Flex Hidraulika”, a leader in hydraulic systems and components in Europe, opened a new administrative, production and warehouse building in Kaunas. It was built by “Conresta”, one of the largest construction companies in Lithuania. The total area of the two-storey building is more than 4000 sq. m.
Finished
General contractor
JSC "Conresta"
Client
JSC „Hansa Flex Hidraulika“
Country
Lithuania
01
Construction period:
2016 09 - 2017 06
02
Building area:
4135,13 m2
03
Innovative construction modeling:
BIM
In order to make the construction process as smooth as possible, “Conresta has”, on its own initiative, transferred the technical side of the project to BIM (Building Information Modeling). The use of this tool has led to a smoother construction process, improved planning, more accurate material orders, and helped save both financial and human resources.
Without a doubt, “Conresta” is a trusted partner with a much broader view of construction implementation than usual. Transferring the project to BIM and other cutting-edge ideas have helped optimize costs, and with an experienced team and efficient planning, everything went exactly as planned.
Juozas Vyšniauskis, the CEO of „Hansa Flex Hidraulika“Eurovaistinė logistics centre
Stage I of Ukmergė Industrial Park
Refinis factory
Omniva parcel sorting terminal
Lidl Lietuva (Lidl Lithuania) logistics centre
Finished
Modernisation of the Medininkai Border Crossing Point
The construction of Vilnius Combined Heat and Power Plant using municipal waste and biofuel
Construction of the KG Constructions Group factory and office building
Finished
Automated Lithuanian Post Logistics Center
Finished
“Vilniaus Baldai” Factory in Trakai District (Value – 50 Million Euros)
Finished
“Litgrid” system control and data center
Finished
Automated “Continental Automotive” factory in the FEZ of Kaunas
Finished
“Creolink” Warehouse With Administrative Premises
Finished
The Construction of 2 Modules of “Hegelmann Transporte” Logistics Complex
Finished
A Modern Food Production Manufactory of “Vilnius Poultry Farm” in Rudamina
Finished
“Ogisanda” Warehouse & Administration Building
Finished
“Ikarai” Liquid Fertilizer Plant, Kėdainiai FEZ
Finished
Class A Logistics Center of „Liepkalnis Industrial Park”
Finished
“Kaišiadorys Poultry Farm” Bird Breeding Complex
Finished
Fire and Rescue Training Center
Finished
“Brenntag Lithuania” Warehouse & Administration Building
Finished
“ABB” High Voltage Switchgear in Alytus
Finished
„Alviva“ Sewing Factory
Finished
„Entafarma“ Pharmaceutical Warehouse & Administration Building
Finished
“Grainmore” Automated Probiotic Processing Plant & Laboratory
Finished
The Reconstruction of Industrial Sewing Building “Lelija”
Finished
“Schmitz Cargobull Baltic” Production Building
Finished
Eišiškės Border Control Point
Finished
The Extension of “WOOD LINE” Warehouse
Finished
The Reconstruction of “Galinta & CO” Production Lines
Finished
Fire and Rescue Department
Finished