fr lt en

“Hansa Flex Hidraulika” Administrative, Industrial & Warehouse Building

On May 26, 2017, “Hansa Flex Hidraulika”, a leader in hydraulic systems and components in Europe, opened a new administrative, production and warehouse building in Kaunas. It was built by “Conresta”, one of the largest construction companies in Lithuania. The total area of the two-storey building is more than 4000 sq. m.

Finished
General contractor

JSC "Conresta"

Client

JSC „Hansa Flex Hidraulika“

Country

Lithuania

01

Construction period:

2016 09 - 2017 06

02

Building area:

4135,13 m2

03

Innovative construction modeling:

BIM

In order to make the construction process as smooth as possible, “Conresta has”, on its own initiative, transferred the technical side of the project to BIM (Building Information Modeling). The use of this tool has led to a smoother construction process, improved planning, more accurate material orders, and helped save both financial and human resources.

Without a doubt, “Conresta” is a trusted partner with a much broader view of construction implementation than usual. Transferring the project to BIM and other cutting-edge ideas have helped optimize costs, and with an experienced team and efficient planning, everything went exactly as planned.

Juozas Vyšniauskis, the CEO of „Hansa Flex Hidraulika“

Other projects

Finished

Modernisation of the Medininkai Border Crossing Point

Finished

Automated Lithuanian Post Logistics Center

Finished

“Vilniaus Baldai” Factory in Trakai District (Value – 50 Million Euros)

Finished

“Litgrid” system control and data center

Finished

Automated “Continental Automotive” factory in the FEZ of Kaunas

Finished

“Creolink” Warehouse With Administrative Premises

Finished

The Construction of 2 Modules of “Hegelmann Transporte” Logistics Complex

Finished

A Modern Food Production Manufactory of “Vilnius Poultry Farm” in Rudamina

Finished

“Ogisanda” Warehouse & Administration Building

Finished

“Ikarai” Liquid Fertilizer Plant, Kėdainiai FEZ

Finished

Class A Logistics Center of „Liepkalnis Industrial Park”

Finished

“Kaišiadorys Poultry Farm” Bird Breeding Complex

Finished

Fire and Rescue Training Center

Finished

“Brenntag Lithuania” Warehouse & Administration Building

Finished

“ABB” High Voltage Switchgear in Alytus

Finished

„Alviva“ Sewing Factory

Finished

„Entafarma“ Pharmaceutical Warehouse & Administration Building

Finished

“Grainmore” Automated Probiotic Processing Plant & Laboratory

Finished

The Reconstruction of Industrial Sewing Building “Lelija”

Finished

“Schmitz Cargobull Baltic” Production Building

Finished

Eišiškės Border Control Point

Finished

The Extension of “WOOD LINE” Warehouse

Finished

The Reconstruction of “Galinta & CO” Production Lines

Finished

Fire and Rescue Department

Finished

“Airo Catering Services Lietuva” Cooking Manufactory