General contractor “Conresta” has been entrusted with the first two phases of construction of the logistics complex owned by the German capital logistics company “Hegelmann Transporte”. A total of 6 project implementation stages are planned, after which the premises will occupy an impressive 38,000 sq. m. and the total investment of the logistics center will amount to 20 million euros.
JSC "Conresta"
JSC „Hegelmann Transporte Lietuva“
Lithuania
JSC „Kita kryptis“
I stage area:
9580 m2
II stage area:
5391 m2
Warehouse height:
17,55 m
The first phase included the construction of a 5643 sq. m. warehouse building, with its height reaching 17.5 meters, and a 4-storey, class A energy-efficient administrative building of 4007 sq. meters and 500 workplaces. Construction period: 08.2017 – 05.2017.
The outer partitions of the administrative part of the building were assembled from prefabricated three-layer reinforced concrete slabs, the outer surface of which is made of white pigmented cement. Because the structure of these panels is extracted using the special NOEliner Glatt matrix, we had to pay special attention to the installation process.
Another construction challenge was the installation of a 16 m long, 5 m high truss that weighs 14 tons. The truss of such dimensions had to be fabricated and delivered to the facility in one piece and fitted with wall panels. An entrance space was created from it.
In the second phase another 5443 sq m warehouse building was built. Construction Period: 2018.03 – 2019.02. A total of 20 million euros will be invested in the logistics complex of 6 hectares near Kaunas “Hegelmann Group.” In the future, the total area of the buildings here is planned to reach 38,000 sq. meters.
In the western part of the storage space there are 45 gates for trucks, in the eastern part – 30 gates for minibuses. Also, 357 parking spots with special spaces for disabled people and electric vehicles were designed in the 60,000 sq ft. m. area.
Managed risks
- Clay soil & High groundwater
- Oversized and heavy administrative structures of the building
- Exceptional warehouse height
Materiality
- Flaps made of prefabricated three-layer reinforced concrete slabs
- The panel coating is particularly resistant to corrosion class C5
- Premium interior finishes
Innovations
- All entrances with automatic plate recognition system
- Lithium battery wheel loaders
Features
- Exceptional height storage up to 17 m.
- 45 gates for trucks
- 30 gates for minivans
Ecology
- Lithium battery wheel loaders
- Efficient Lighting
- 4 EV charging stations
Administrative quarters:
4007 m2
Lighting:
Efficient
Wheel loaders:
Lithium batteries
II stage construction period:
2017 08 - 2019 05