fr lt en

The Construction of 2 Modules of “Hegelmann Transporte” Logistics Complex

General contractor “Conresta” has been entrusted with the first two phases of construction of the logistics complex owned by the German capital logistics company “Hegelmann Transporte”. A total of 6 project implementation stages are planned, after which the premises will occupy an impressive 38,000 sq. m. and the total investment of the logistics center will amount to 20 million euros.

Finished
General contractor

JSC "Conresta"

Client

JSC „Hegelmann Transporte Lietuva“

Country

Lithuania

Architect / Designer

JSC „Kita kryptis“

01

I stage area:

9580 m2

02

II stage area:

5391 m2

03

Warehouse height:

17,55 m

The first phase included the construction of a 5643 sq. m. warehouse building, with its height reaching 17.5 meters, and a 4-storey, class A energy-efficient administrative building of 4007 sq. meters and 500 workplaces. Construction period: 08.2017 – 05.2017.

The outer partitions of the administrative part of the building were assembled from prefabricated three-layer reinforced concrete slabs, the outer surface of which is made of white pigmented cement. Because the structure of these panels is extracted using the special NOEliner Glatt matrix, we had to pay special attention to the installation process.

Another construction challenge was the installation of a 16 m long, 5 m high truss that weighs 14 tons. The truss of such dimensions had to be fabricated and delivered to the facility in one piece and fitted with wall panels. An entrance space was created from it.

In the second phase another 5443 sq m warehouse building was built. Construction Period: 2018.03 – 2019.02. A total of 20 million euros will be invested in the logistics complex of 6 hectares near Kaunas “Hegelmann Group.” In the future, the total area of the buildings here is planned to reach 38,000 sq. meters.

In the western part of the storage space there are 45 gates for trucks, in the eastern part – 30 gates for minibuses. Also, 357 parking spots with special spaces for disabled people and electric vehicles were designed in the 60,000 sq ft. m. area.

Project

Managed risks

  • Clay soil & High groundwater
  • Oversized and heavy administrative structures of the building
  • Exceptional warehouse height

Materiality

  • Flaps made of prefabricated three-layer reinforced concrete slabs
  • The panel coating is particularly resistant to corrosion class C5
  • Premium interior finishes

Innovations

  • All entrances with automatic plate recognition system
  • Lithium battery wheel loaders

Features

  • Exceptional height storage up to 17 m.
  • 45 gates for trucks
  • 30 gates for minivans

Ecology

  • Lithium battery wheel loaders
  • Efficient Lighting
  • 4 EV charging stations
04

Administrative quarters:

4007 m2

05

Lighting:

Efficient

06

Wheel loaders:

Lithium batteries

07

II stage construction period:

2017 08 - 2019 05

The Hegelmann Group” has branches in 15 countries, but the Lithuanian branch is one of the largest and most strategically important to us. We have significant plans in Lithuania, which is why we are opening an office and further developing the “Hegelmann” logistics center.

Anton and Siegfried Hegelmann, “The Hegelmann Group” shareholders

Other projects

Eurovaistinė logistics centre

Stage I of Ukmergė Industrial Park

Refinis factory

Omniva parcel sorting terminal

Lidl Lietuva (Lidl Lithuania) logistics centre

Finished

Modernisation of the Medininkai Border Crossing Point

The construction of Vilnius Combined Heat and Power Plant using municipal waste and biofuel

Construction of the KG Constructions Group factory and office building

Finished

Automated Lithuanian Post Logistics Center

Finished

“Vilniaus Baldai” Factory in Trakai District (Value – 50 Million Euros)

Finished

“Litgrid” system control and data center

Finished

Automated “Continental Automotive” factory in the FEZ of Kaunas

Finished

“Creolink” Warehouse With Administrative Premises

Finished

A Modern Food Production Manufactory of “Vilnius Poultry Farm” in Rudamina

Finished

“Ogisanda” Warehouse & Administration Building

Finished

“Ikarai” Liquid Fertilizer Plant, Kėdainiai FEZ

Finished

“Hansa Flex Hidraulika” Administrative, Industrial & Warehouse Building

Finished

Class A Logistics Center of „Liepkalnis Industrial Park”

Finished

“Kaišiadorys Poultry Farm” Bird Breeding Complex

Finished

Fire and Rescue Training Center

Finished

“Brenntag Lithuania” Warehouse & Administration Building

Finished

“ABB” High Voltage Switchgear in Alytus

Finished

„Alviva“ Sewing Factory

Finished

„Entafarma“ Pharmaceutical Warehouse & Administration Building

Finished

“Grainmore” Automated Probiotic Processing Plant & Laboratory

Finished

The Reconstruction of Industrial Sewing Building “Lelija”

Finished

“Schmitz Cargobull Baltic” Production Building

Finished

Eišiškės Border Control Point

Finished

The Extension of “WOOD LINE” Warehouse

Finished

The Reconstruction of “Galinta & CO” Production Lines

Finished

Fire and Rescue Department

Finished

“Airo Catering Services Lietuva” Cooking Manufactory