“Schmitz Cargobull Baltic” Production Building
In 2016, the general contractor “Conresta” was entrusted with the construction and infrastructure reconstruction of the “Schmitz Cargobull Baltic” production building.
Finished
General contractor
JSC "Conresta"
Client
JSC „Schmitz Cargobull Baltic“
Country
Lithuania
Architect / Designer
JSC "Inekstra"
01
Construction start:
2016 04
02
Construction period:
5 months
03
Project area:
2 405 m2
The project applied ecological and environmental standards of the time. During the construction and reconstruction, “Conresta” carried out the ventilated facade, plinth, window, doors, parapet replacement and masonry work. The height of the two-storey building is 12 meters. The total area of the building – 2405 sq. meters, address Pramonės str. 16 A, Panevėžys.
04
Building height:
12 m
05
Number of floors:
2
Eurovaistinė logistics centre
Stage I of Ukmergė Industrial Park
Refinis factory
Omniva parcel sorting terminal
Lidl Lietuva (Lidl Lithuania) logistics centre
Finished
Modernisation of the Medininkai Border Crossing Point
The construction of Vilnius Combined Heat and Power Plant using municipal waste and biofuel
Construction of the KG Constructions Group factory and office building
Finished
“Vilniaus Baldai” Factory in Trakai District (Value – 50 Million Euros)
Finished
Automated Lithuanian Post Logistics Center
Finished
“Litgrid” system control and data center
Finished
Automated “Continental Automotive” factory in the FEZ of Kaunas
Finished
“Creolink” Warehouse With Administrative Premises
Finished
The Construction of 2 Modules of “Hegelmann Transporte” Logistics Complex
Finished
A Modern Food Production Manufactory of “Vilnius Poultry Farm” in Rudamina
Finished
“Ogisanda” Warehouse & Administration Building
Finished
“Ikarai” Liquid Fertilizer Plant, Kėdainiai FEZ
Finished
“Hansa Flex Hidraulika” Administrative, Industrial & Warehouse Building
Finished
Class A Logistics Center of „Liepkalnis Industrial Park”
Finished
“Kaišiadorys Poultry Farm” Bird Breeding Complex
Finished
Fire and Rescue Training Center
Finished
“Brenntag Lithuania” Warehouse & Administration Building
Finished
“ABB” High Voltage Switchgear in Alytus
Finished
„Alviva“ Sewing Factory
Finished
„Entafarma“ Pharmaceutical Warehouse & Administration Building
Finished
“Grainmore” Automated Probiotic Processing Plant & Laboratory
Finished
The Reconstruction of Industrial Sewing Building “Lelija”
Finished
Eišiškės Border Control Point
Finished
The Extension of “WOOD LINE” Warehouse
Finished
The Reconstruction of “Galinta & CO” Production Lines
Finished
Fire and Rescue Department
Finished