“Brenntag Lithuania” Warehouse & Administration Building
“Conresta” has been entrusted with the building of a wholesale warehouse project. It includes a packing post, a ramp and a tanker truck loading-unloading station. The total area of the building is 1560.74 sq. meters.
Finished
General contractor
JSC "Conresta"
Client
JSC „Brenntag Lietuva“
Country
Lithuania
Architect / Designer
JSC "Sweco"
01
Construction start:
2015 10
02
Construction period:
9 mmonths
03
Project area:
1 560 m2
The object is designed for the discharge of liquid chemicals from road tankers, as well as for filling them up with prepared liquid chemicals. Warehouses store pre-packed products such as alkalis, neutral liquids and solids, acid, diluents. The building is equipped with dosimeters, which measure the level of harmful substances in the air. The building consists of reinforced concrete columns, metal trusses and drop-down-structures. Project address: Palemono str. 171 D, Kaunas.
04
Building height:
11 m
05
Number of floors:
4
06
Purpose
Specialized
Eurovaistinė logistics centre
Stage I of Ukmergė Industrial Park
Refinis factory
Omniva parcel sorting terminal
Lidl Lietuva (Lidl Lithuania) logistics centre
Finished
Modernisation of the Medininkai Border Crossing Point
The construction of Vilnius Combined Heat and Power Plant using municipal waste and biofuel
Construction of the KG Constructions Group factory and office building
Finished
Automated Lithuanian Post Logistics Center
Finished
“Vilniaus Baldai” Factory in Trakai District (Value – 50 Million Euros)
Finished
“Litgrid” system control and data center
Finished
Automated “Continental Automotive” factory in the FEZ of Kaunas
Finished
“Creolink” Warehouse With Administrative Premises
Finished
The Construction of 2 Modules of “Hegelmann Transporte” Logistics Complex
Finished
A Modern Food Production Manufactory of “Vilnius Poultry Farm” in Rudamina
Finished
“Ogisanda” Warehouse & Administration Building
Finished
“Ikarai” Liquid Fertilizer Plant, Kėdainiai FEZ
Finished
“Hansa Flex Hidraulika” Administrative, Industrial & Warehouse Building
Finished
Class A Logistics Center of „Liepkalnis Industrial Park”
Finished
“Kaišiadorys Poultry Farm” Bird Breeding Complex
Finished
Fire and Rescue Training Center
Finished
“ABB” High Voltage Switchgear in Alytus
Finished
„Alviva“ Sewing Factory
Finished
„Entafarma“ Pharmaceutical Warehouse & Administration Building
Finished
“Grainmore” Automated Probiotic Processing Plant & Laboratory
Finished
The Reconstruction of Industrial Sewing Building “Lelija”
Finished
“Schmitz Cargobull Baltic” Production Building
Finished
Eišiškės Border Control Point
Finished
The Extension of “WOOD LINE” Warehouse
Finished
The Reconstruction of “Galinta & CO” Production Lines
Finished
Fire and Rescue Department
Finished