fr lt en

“Ogisanda” Warehouse & Administration Building

General contracting and construction company “Conresta” has built a one-story warehouse with an off-shelf office for “Ogisanda”, a commercial and warehouse leasing company. The warehouse building is located in a strategically convenient location – close to Vilnius Airport.

Finished
General contractor

JSC "Conresta"

Client

JSC „Ogisanda“

Country

Lithuania

01

Construction started:

2017 02

02

Construction period:

5 months

03

Project area:

2000 m2

The project consists of two parts: a two-story south side building for administration and a one-story north side building for storage. The total area of the building – more than 2000 sq. meters, height – 9.2 m. Multi-layered composite panels were used for the construction of the warehouse facade. Light metal constructions with roll roofing were used for construction of the roof. The warehouse also has concrete floors. In the administrative section of the building we’ve used prefabricated reinforced concrete structures. All premises are heated by a boiler house, which has two condensing boilers. Separate heating, cooling and ventilation systems were also installed. The biggest challenge during construction is time. This project was fully implemented within the span of 5 months.

Other projects

Eurovaistinė logistics centre

Stage I of Ukmergė Industrial Park

Refinis factory

Omniva parcel sorting terminal

Lidl Lietuva (Lidl Lithuania) logistics centre

Finished

Modernisation of the Medininkai Border Crossing Point

The construction of Vilnius Combined Heat and Power Plant using municipal waste and biofuel

Construction of the KG Constructions Group factory and office building

Finished

Automated Lithuanian Post Logistics Center

Finished

“Vilniaus Baldai” Factory in Trakai District (Value – 50 Million Euros)

Finished

“Litgrid” system control and data center

Finished

Automated “Continental Automotive” factory in the FEZ of Kaunas

Finished

“Creolink” Warehouse With Administrative Premises

Finished

The Construction of 2 Modules of “Hegelmann Transporte” Logistics Complex

Finished

A Modern Food Production Manufactory of “Vilnius Poultry Farm” in Rudamina

Finished

“Ikarai” Liquid Fertilizer Plant, Kėdainiai FEZ

Finished

“Hansa Flex Hidraulika” Administrative, Industrial & Warehouse Building

Finished

Class A Logistics Center of „Liepkalnis Industrial Park”

Finished

“Kaišiadorys Poultry Farm” Bird Breeding Complex

Finished

Fire and Rescue Training Center

Finished

“Brenntag Lithuania” Warehouse & Administration Building

Finished

“ABB” High Voltage Switchgear in Alytus

Finished

„Alviva“ Sewing Factory

Finished

„Entafarma“ Pharmaceutical Warehouse & Administration Building

Finished

“Grainmore” Automated Probiotic Processing Plant & Laboratory

Finished

The Reconstruction of Industrial Sewing Building “Lelija”

Finished

“Schmitz Cargobull Baltic” Production Building

Finished

Eišiškės Border Control Point

Finished

The Extension of “WOOD LINE” Warehouse

Finished

The Reconstruction of “Galinta & CO” Production Lines

Finished

Fire and Rescue Department

Finished

“Airo Catering Services Lietuva” Cooking Manufactory